2.5.1 Specifying HVAC Capacities for the Proposed Design
As shown in Figure 2.4-1, the proposed design shall have no more than 300 unmet load hours. If this requirement is violated, the software shall require the user to make changes to the proposed design building description to bring the unmet load hours below 300. This process is not automated by the software. There are two tests that must be met:
- Space loads must be satisfied: Space temperatures must be maintained within one half of the throttling range (e.g., 1°F with a 2°F throttling range) of the scheduled heating or cooling thermostat setpoints. This criterion may be exceeded for no more than 300 hours for a typical year.
- System loads must be satisfied: Plant equipment must have adequate capacity to satisfy the HVAC system loads. This criterion may be exceeded for no more than 300 hours for a typical year.
If either the space or system loads do not meet the above criteria, the equipment in the proposed design shall be resized by the user and appropriate changes shall be made to the construction documents such that the criteria are met. If the space conditioning criteria are not met because the HVAC equipment in the proposed design lacks the capability to provide either heating or cooling, equipment capable of providing the needed space conditioning must be added by the user. The type of equipment added will depend on the type of HVAC system in the proposed design and the judgment of the energy analyst.
Equipment sizes for the proposed design shall be entered into the model by the energy analyst and shall agree with the equipment sizes specified in the construction documents. When the simulations of these actual systems indicate that specified space conditions are not being adequately maintained in one or more thermal block(s), the user shall be prompted to make changes to equipment sizes and to make corresponding changes to the construction documents. This occurs when the unmet load hours exceed 300 for the year.
- PDF Version of Visible Section/s
- Generate Complete PDF
- Printer-friendly Version
- Login or register to post comments
Select a Purpose
Download PDF
Book Navigation
- Commercial Buildings Energy Modeling Guidelines & Procedures (MGP)
- Acknowledgments
- 1 Overview
- 2 General Modeling Procedures
- 3 Software Requirements
- 4 Content and Format of Standard Reports
- 5 Energy Costs and Currency Specification
- 6 Building Decriptors Reference
- 6.1 Overview
- 6.2 Project Data
- 6.3 Thermal Blocks
- 6.4 Space Uses
- 6.5 Building Envelope Data
- 6.6 HVAC Zone Level Systems
- 6.7 HVAC Secondary Systems
- 6.8 HVAC Primary Systems
- 6.9 Miscellaneous Energy Uses
- 6.10 On-Site Power Generation
- 6.11 Common Data Structures
- 6.11.1 Schedule
- 6.11.2 Holidays
- 6.11.3 Surface Geometry
- 6.11.4 Opening Geometry
- 6.11.5 Opening Shade
- 6.11.6 Construction Assembly
- 6.11.7 Fenestration Construction
- 6.11.8 Material
- 6.11.9 Slab Construction
- 6.11.10 Exterior Surface Properties
- 6.11.11 Building Shade
- 6.11.12 Utility Rate
- 6.11.13 Occupant Heat Rate
- 6.11.14 Furniture and Contents
- 6.11.15 Reference Position in a Space
- 6.11.16 Two Dimensional Curve
- 6.11.17 Three Dimensional Curve
- 6.11.18 Temperature Reset Schedule
- 6.11.19 Photovoltaic (PV) Panel
- 6.11.20 Contact
- 7 Advanced Modeling Tips
- 7.1 Challenging Building Types
- 7.2 Design Features
- 7.2.1 Automatically Controlled Window Shades
- 7.2.2 Active Chilled Beams
- 7.2.3 Dedicated Outside Air Systems (DOAS)
- 7.2.4 Displacement ventilation
- 7.2.5 Gas Engine Driven Heat Pumps
- 7.2.6 Ground Source Heat Pumps
- 7.2.7 Ice Storage Air Conditioners
- 7.2.8 Radiant Heating and/or Cooling
- 7.2.9 Switchable glazing
- 7.2.10 UFAD
- 7.2.11 Variable Refrigerant Flow
- Download Appendices
